SPI ENERGY CO., LTD. filed this Form 20-F on 10/27/2017
Entire Document
 

Table of Contents

 

Solar Projects in Operation*

 

Country

 

Project name

 

Gross
capacity
(MW)

 

Our
equity
holding

 

Attributable
capacity
(MW)

 

Ground/
Rooftop

 

Connection
date

 

FIT terms

Greece

 

Sinsin Renewable Investment Limited

 

26.6

 

100

%

26.6

 

Ground

 

February to October 2013

 

EUR0.14-0.38/kWh1

China

 

Gonghe County Xinte Photovoltaic Co., Ltd.

 

20.0

 

100

%

20.0

 

Ground

 

December 2013

 

RMB1.00/kWh2

China

 

Hefei 200 Residents Project

 

1.02

 

100

%

1.02

 

Rooftop

 

August 2015

 

RMB1.06/kWh3

China

 

Feixi County Hospital Project

 

0.146

 

100

%

0.146

 

Rooftop

 

December 2015

 

RMB1.57/kWh4

China

 

Shanghai Siyuan Project

 

0.224

 

100

%

0.224

 

Rooftop

 

January 2016

 

RMB1.58/kWh5

China

 

Suzhou Tong Yuan Fang Project

 

0.199

 

100

%

0.199

 

Rooftop

 

March 2016

 

RMB1.2416/kWh6

China

 

Shanghai Gene Technology Project

 

0.101

 

100

%

0.101

 

Rooftop

 

April 2016

 

RMB1.27/kWh7

China

 

Suzhou Mudu Studio City Project

 

0.2244

 

100

%

0.2244

 

Rooftop

 

April 2016

 

RMB1.166/kWh8

China

 

Suzhou Hen Sheng Project

 

0.160

 

100

%

0.160

 

Rooftop

 

April 2016

 

RMB1.166/kWh9

China

 

Nantong Anda Project

 

4.791

 

100

%

4.791

 

Rooftop

 

May 2016

 

RMB 1/kWh10

China

 

Fuzhou Meicheng Project

 

1.705

 

100

%

1.705

 

Rooftop

 

May 2016

 

RMB 1/kWh11

China

 

Suzhou Meiliang Project

 

2.036

 

100

%

2.036

 

Rooftop

 

May 2016

 

RMB1.6269/kWh12

Italy

 

SPI Renewables Energy (Luxembourg) Private Limited Company S.a.r.l. (formerly known as CECEP Solar Energy (Luxembourg) Private Limited Company (S.a.r.l.)); Italsolar S.r.l.

 

4.3

 

100

%

4.3

 

Ground and Rooftop

 

December 2009

 

EUR0.22-0.35/kWh

UK

 

Cairnhill Solarfield Limited

 

3.0906

 

100

%

3.0906

 

Ground

 

February 2016

 

1.3 ROCs

UK

 

Emotion energy Solar One Limited

 

4.971

 

100

%

4.971

 

Ground

 

March 2016

 

1.3 ROCs

Total

 

 

 

69.57

 

 

 

69.57

 

 

 

 

 

 

 


1.                  The PPA agreements did not fix the FIT. The FIT will be charged based on the relevant law in force in Greece. The current law in force is law 4254/2014. According the monthly FIT statements by the electricity supply bureau in Greece, the FIT range of the PV plants was EUR0.14~0.38/kWh in 2014.

 

2.                  It is the government policy of Qinghai Province in China that the PV plants grid-connected at the end of 2013 are entitled to a total electricity price of RMB 1.0/kWh once approved by Development and Reform Committee of Qinghai Province, among which RMB 0.35/kWh is to be paid by State Grid Company directly as set out in the PPA agreement. The remaining part (RMB 0.65/kWh) will be paid as an additional tariff by central government through State Grid Company.

 

3.                  RMB1.02/kWh is a total electricity price entitled to the project, among which RMB0.6/kWh is the price for electricity sold to 200 residents on whose property the PV project is located, RMB0.42/kWh is the national subsidy, and RMB4/kWh will be paid as an additional construction subsidy by the government of Hefei City.

 

4.                  RMB1.57/kWh is a total electricity price entitled to the project, among which RMB0.9/kWh is the price for electricity sold to the hospital on whose property the PV project is located, RMB0.42/kWh is the national subsidy, and RMB0.25/kWh will be paid as an additional tariff by the government of Hefei City.

 

5.                  RMB1.58/kWh is a total electricity price entitled to the project, among which RMB0.91/kWh is the price for electricity sold to the company on whose property the PV project is located, RMB0.42/kWh is the national subsidy, and RMB0.25/kWh will be paid as an additional tariff by the government of Shanghai City.

 

40